Topics Map > Teaching HyFlex
Topics Map > Services > Teaching, Learning and Classrooms > Instrumented Classrooms
Instrumented Classrooms - Table
Equipped with technologies that support and enhance instruction and learning, Instrumented Classrooms at NDSU are technology-rich classrooms that are classified as general-purpose classrooms and labs.
Instructions/Resources
Teaching HyFlex in Instrumented Classrooms
Classroom Details
Every general-purpose classroom and lab at NDSU is equipped as an Instrumented Classroom and includes the following technologies (exceptions noted in the table below):
- AV Control System for easy switching between input devices
- Projector
- Wireless microphone for instructor
- Computer equipped with a CD/DVD drive, USB ports, and Wireless RF mouse
- Additional USB port located left back side of the interactive panel/monitor
- Interactive panel to augment your content while presenting. The interactive panel also serves as your monitor
- Document camera for projecting overhead transparencies and documents
- Air media for wireless screen casting on mobile or portable device
- HDMI and VGA cables for connection of portable devices (see notes for rooms that have USB-C instead of VGA )
- YuJa, Zoom, Blackboard Learn Original, Class Collaborate Ultra ready
- Zoom Room system for a different way to connect with Zoom (see notes for rooms that do not have Zoom Rooms set up yet)
- Instructor and student cameras (see notes for rooms that do not have a student camera)
- Student microphones (see notes for rooms that have a throwable CatchBox microphone rather than ceiling mics)
- Assistive Listening (submit request to Disability Services)
Classroom Type Key
- Fixed: Fixed Seating
- MC: Moveable Chairs
- MD: Moveable Desk
- TCH: Tables and Chairs
- AL: Active Learning
- PL: Project Learning
- ALSU: Active Learning Scale-Up
- CL: Computer Lab with number of computers
Building |
Room |
Classroom Type |
Capacity |
Notes |
---|---|---|---|---|
Ag & Biosystems Engineering (ABEN) | 201 | MD | 48 | Catchbox |
Ag & Biosystems Engineering (ABEN) | 208C | MD | 48 | Catchbox |
Ag & Biosystems Engineering (ABEN) | 215 | TCH | 24 | Catchbox |
Ag & Biosystems Engineering (ABEN) | 224 | MD | 48 | Catchbox |
A. Glenn Hill Center (STEM) | 110 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 112 | Fixed | 295 | Catchbox. Zoom Room not yet set up. |
A. Glenn Hill Center (STEM) | 114 | MC | 24 | |
A. Glenn Hill Center (STEM) | 122 | Fixed | 98 | Zoom Room not yet set up. |
A. Glenn Hill Center (STEM) | 126 | TCH (PL) | 48 | Zoom Room not yet set up. |
A. Glenn Hill Center (STEM) | 130/132 | TCH (AL) (ALSU) | 135 | No Zoom Room system (use Zoom Meeting). No student camera. |
A. Glenn Hill Center (STEM) | 200 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 204 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 206 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 208 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 214 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 216 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 218 | TCH | 36 | |
A. Glenn Hill Center (STEM) | 228 | TCH | 36 | |
A. Glenn Hill Center (STEM) | 230 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 232 | MC | 24 | |
A. Glenn Hill Center (STEM) | 234 | TCH (AL) | 80 | |
A. Glenn Hill Center (STEM) | 238 | MC | 24 | |
A. Glenn Hill Center (STEM) | 240 | CL 48 Windows | 48 | Zoom Room not yet set up. |
A. Glenn Hill Center (STEM) | 300 | TCH (AL) (ALSU) | 99 | No Zoom Room system (use Zoom Meeting). No student camera. |
A. Glenn Hill Center (STEM) | 304 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 306 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 308 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 312 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 314 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 326 | MD (AL) | 60 | |
A. Glenn Hill Center (STEM) | 328 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 330 | MD (AL) | 60 | |
A. Glenn Hill Center (STEM) | 332 | TCH | 24 | |
A. Glenn Hill Center (STEM) | 334 | TCH (AL) | 78 | |
A. Glenn Hill Center (STEM) | 336 | TCH | 24 | |
Barry Hall | 20 | TCH | 50 | |
Barry Hall | 118 | TCH (PL) | 40 | Zoom Room not yet set up. |
Barry Hall | 120 | Fixed | 60 | Laptop USB-C instead of VGA. |
Barry Hall | 126 | Fixed | 60 | Laptop USB-C instead of VGA. |
Barry Hall | 140 | Fixed | 284 | Catchbox. Zoom Room not yet set up. |
Barry Hall | 260 | CL 44 Windows | 44 | Laptop USB-C instead of VGA. |
Barry Hall | 262 | TCH | 60 | Laptop USB-C instead of VGA. |
Barry Hall | 266 | TCH | 72 | Laptop USB-C instead of VGA. |
Barry Hall | 272 | CL 24 Windows | 24 | No instructor camera. Laptop USB-C instead of VGA. |
Barry Hall | 358 | TCH | 40 | Laptop USB-C instead of VGA. |
Barry Hall | 360 | Fixed | 60 | |
Barry Hall | 368 | TCH | 40 | Laptop USB-C instead of VGA. |
Barry Hall | 370 | Fixed | 60 | Laptop USB-C instead of VGA. |
Bentson Bunker Fieldhouse | 29 | MD | 48 | |
Bentson Bunker Fieldhouse | 110A | TCH | 28 | No student camera. |
Bentson Bunker Fieldhouse | 203 | TCH | 36 | |
Bismarck Nursing | 9 (LIB) | MD | 70 | |
Bismarck Nursing | 136 | MD | 56 | Catchbox |
Bismarck Nursing | 139 | MD | 42 | Catchbox |
Bismarck Nursing | 141 | MD | 42 | Catchbox |
Bismarck Nursing | 160 | MD | 56 | Catchbox |
Civil & Industrial Engineering (CIE) | 101 | TCH | 63 | Catchbox. Laptop USB-C instead of VGA. |
Civil & Industrial Engineering (CIE) | 205 | TCH | 38 | |
Civil & Industrial Engineering (CIE) | 207 | TCH | 39 | |
Construction Management (CME) | Auditorium | Fixed | 170 | Catchbox |
Dolve | 10 | MD | 48 | |
Dolve | 117 | TCH | 48 | |
Dolve | 118 | TCH | 48 | |
Dolve | 202 | TCH | 48 | |
Dolve | 204 | TCH | 33 | |
Dolve | 215 | TCH | 48 | |
E. Morrow-Lebedeff (EML) | 170 | TCH | 32 | Laptop USB-C instead of VGA |
E. Morrow-Lebedeff (EML) | 183 | TCH | 32 | Laptop USB-C instead of VGA |
E. Morrow-Lebedeff (EML) | 314 | MD | 65 | |
E. Morrow-Lebedeff (EML) | 324 | Fixed | 42 | Interactive Whiteboard |
E. Morrow-Lebedeff (EML) | 326 | CL 18 Windows | 18 | |
Ehly | 220 | TCH | 51 | Catchbox |
Electrical and Computer Engineering (ECE) | 123 | MD | 48 | |
Electrical and Computer Engineering (ECE) | 125 | Fixed | 94 | Catchbox |
Electrical and Computer Engineering (ECE) | 213 | MD | 31 | |
Electrical and Computer Engineering (ECE) | 243 | MD | 39 | |
Engineering | 102 | CL 18 Windows | 18 | |
Engineering | 214 | TCH | 40 | |
Family Life Center (FLC) | 120 | CL 32 Windows | 32 | |
Family Life Center (FLC) | 122 | Fixed | 94 | Catchbox |
Family Life Center (FLC) | 124 | Fixed | 183 | Catchbox |
Family Life Center (FLC) | 313 | MD | 46 | No student camera. |
Family Life Center (FLC) | 410 | TCH | 40 | |
Family Life Center (FLC) | 415A | TCH | 48 | |
Ladd | 107 | Fixed | 179 | Catchbox |
Ladd | 114 | Fixed | 48 | Laptop USB-C instead of VGA |
Ladd | 209 | TCH | 48 | |
Library | 14 | CL 60 Windows | 60 | |
Loftsgard | 102 | Fixed | 48 | |
Loftsgard | 104 | TCH | 24 | |
Loftsgard | 114 | Fixed | 125 | Catchbox. |
Loftsgard | 116 | TCH | 24 | |
Mathew Living Learning Center (MLLC) | 104 | TCH | 24 | No student camera. |
Mathew Living Learning Center (MLLC) | 126 | TCH | 18 | No student camera. |
Mathew Living Learning Center West (MLLCW) | 124 | TCH | 45 | |
Minard | 112 | MD | 110 | Catchbox |
Minard | 116 | Fixed | 250 | Catchbox |
Minard | 118 | MD | 39 | |
Minard | 208 | MD | 38 | |
Minard | 210 | MD | 48 | |
Minard | 212 | MD | 56 | |
Minard | 214 | MD | 42 | |
Minard | 220 | MD | 36 | |
Minard | 230 | Fixed | 174 | Catchbox |
Minard | 302 | MD | 48 | |
Minard | 306 | MD | 48 | |
Minard | 308 | MD | 33 | |
Minard | 310 | MD | 85 | |
Minard | 332 | CL 15 Mac | 15 | |
Morrill | 101 | TCH | 12 | No student camera. |
Morrill | 103 | Fixed | 78 | |
Morrill | 105 | Fixed | 61 | |
Morrill | 107 | Fixed | 48 | |
Morrill | 109 | TCH | 36 | |
Morrill | 111 | CL 14 Windows | 14 | |
Music | 111 | MD | 37 | Interactive Whiteboard |
Music | 113 | MD | 30 | Interactive Whiteboard |
Music | 117 | MD | 35 | Interactive Whiteboard |
Quentin Burdick Building | 102 | MD | 40 | Interactive Whiteboard. |
Quentin Burdick Building | 104 | Fixed | 180 | Catchbox |
Quentin Burdick Building | 106 | MD | 46 | Interactive Whiteboard. |
Quentin Burdick Building | 114 | CL 24 Windows | 24 | |
Quentin Burdick Building | 116 | CL 46 Windows | 46 | |
Quentin Burdick Building | 132 | CL 24 Windows | 24 | |
Quentin Burdick Building | 422 | TCH | 30 | Zoom Room not yet set up. |
Renaissance (Downtown) | 114 | TCH | 70 | Catchbox |
Renaissance (Downtown) | 214 | TCH | 30 | Catchbox |
Shepperd | 109 | MD | 48 | Catchbox |
South Engineering | 116 | Fixed | 71 | Catchbox. Laptop USB-C instead of VGA. |
South Engineering | 118 | MD | 48 | |
South Engineering | 120 | MD | 48 | |
South Engineering | 208 | MD | 48 | |
South Engineering | 314 | TCH | 24 | Catchbox |
Stevens | 230 | MD | 48 | Laptop USB-C instead of VGA. |
Stevens | 231 | MD | 33 | |
Gate City Bank Auditorium | Gate City Bank Auditorium | Fixed | 391 | Catchbox. Zoom Room not yet set up. |
Sudro | 21 | TCH | 92 | |
Sudro | 22 | TCH | 89 | |
Sudro | 24 | Fixed | 222 | Catchbox |
Sudro | 26 | Fixed | 96 | |
Sudro | 27 | Fixed | 120 | Catchbox |
Sugihara | 118 | TCH | 36 | |
Sugihara | 252 | TCH | 49 | |
Van Es | 101 | Fixed | 136 | Catchbox. Laptop USB-C instead of VGA. |
Walster | 204 | MD | 40 | |
Walster | 217 | MD | 39 | Catchbox. No student camera. |
Walster | 220 | MD | 49 | |
Walster | 221 | TCH | 42 | Catchbox. No student camera. |
Walster | 315 | TCH | 30 | Catchbox. No student camera. |
West Dining Center | 4 | CL 33 Windows | 33 |